Process plant tailings deposited in tailings storage facilities (TSFs) represent a significant waste stream produced by mines. By responsibly managing these wastes, we minimise their environmental and potential social impacts and demonstrate our commitment to maintaining our social licence to operate.

All operations have tailings management plans in place, including closure and post-closure management plans. After decommissioning, our TSFs are closed and rehabilitated in line with industry good practice. As at end-2019, our 11 operations – including our three JV sites, being the Asanko gold mine (AGM) in Ghana, Gruyere in Australia and Far Southeast (FSE) in the Philippines – contained 34 TSFs, of which 12 were active. During 2019, we commissioned the TSF at the new Gruyere mine and decommissioned TSF 3 at the Tarkwa mine in Ghana.

Of active TSFs, we have two in-pit TSFs (Agnew and St Ives), six downstream/centre-line TSFs, and four upstream TSFs.

Our mines in Australia and South Africa are located in relatively dry regions and limited amounts of supernatant water are stored in the facilities, significantly improving the overall stability of the facilities. In Ghana, Tarkwa's and Damang's TSFs are designed in accordance with industry best practice. We take extensive measures to confirm that the embankments remain stable throughout both the wet and dry seasons, and over the life of the facility.

Gold Fields is working with Lepanto Mining, our majority partner in the FSE project, to enhance risk mitigating measures for the TSF used by Lepanto Mining for disposal from its nearby gold mine. Since this TSF is located in a region prone to high seismic activity and frequent typhoons, Gold Fields and Lepanto Mining commissioned external consultants to undertake detailed hydrological, seismic and geotechnical reviews in support of improving the overall risk profile of the TSF.

Our technical teams continue to work with Asanko Gold, who manages AGM, to further strengthen risk assessment and governance of the lined and downstream-raised TSF.

Tailings depositions were 20% higher in 2019 than in 2018, amid generally higher production volumes, particularly at South Deep, and the commencement of mining at Gruyere.

Industry response to recent TSF failures

The mining industry's TSFs are in the spotlight following the catastrophic tailings failure at Vale's Feijão iron ore mine in Brumadinho, Brazil, in January 2019, which resulted in the deaths of 270 people. This follows the 19 fatalities during the Samarco TSF failure in 2015, also in Brazil, and significant environmental damage as a result of the Mt Polley tailings dam collapse in Canada in 2014.

After the Samarco incident, ICMM members developed a Tailings Position Statement in 2016 and approved a tailings aspirational goals roadmap in 2018. Gold Fields' Group Tailings Management Guidelines were aligned to the Position Statement in 2017 and strengthened with the inclusion of additional performance guidance and minimum assessment criteria in 2018.

Subsequent to the Brumadinho tragedy, ICMM members, UN Environment and the UN Principles for Responsible Investment established an independent panel of experts to develop a new international standard for TSFs. A public consultation review period for the first draft of a new Global Tailings Standard (GTS) ended in December 2019. It is expected that the new GTS will be finalised during 2020. Upon release, Gold Fields will carry out gap analyses of current TSF governance and operating practices against the new standard, and then commence work on closing identified gaps, where feasible.

The Brumadinho tragedy also prompted the Church of England Pensions Board, along with other investors and UN Environment Programme, to submit a request to hundreds of global mining companies. Gold Fields' extensive response to this information request can be found on our website at www.goldfields.com/environment.php.

TSF governance and technical work

All Gold Fields' active TSFs are subject to an independent, external audit every three years – or more frequently where required by local circumstances or regulations – as well as regular inspections and formal reviews by independent Engineers of Record (EoRs). The last external expert review was completed in 2017 and concluded that Gold Fields complied with the ICMM's Position Statement and that its TSFs, which were well managed and designed, did not show any signs of instability.

Gold Fields has progressively been implementing several improvements identified by this review, including:

  • Consideration of international seismicity design requirements in all jurisdictions
  • Appointments of an EoR for all Gold Fields'-managed TSF
  • Undertaking or updating dam break assessments
  • Updating operating maintenance and surveillance manuals and emergency response plans

The next round of independent external audits commenced at the end of 2019 and is due for completion by mid-2020. We have also embarked on a programme to further improve operational safety of our TSFs, including moving away from the construction of upstream facilities to centre-line or downstream designs, where practical, consideration of filtered and dry stacked tailings, as well as in-pit tailings disposal. These initiatives will also be the subject of work at the ICMM to improve critical TSF controls and reduce tailings water content.

In line with this programme, we have implemented or are in the process of implementing the following actions at our operations:

  • A new downstream TSF at Damang
  • The use of filtered and dry stacked tailings at the new Salares Norte mine
  • The increased use of in-pit tailings disposal in Australia (Agnew and St Ives)
  • Increased use of tailings for underground backfill at the South Deep, Granny Smith and St Ives operations
  • Improved governance over seepage control from TSFs through the installation of geomembrane liners. All our recently constructed TSFs are lined with either natural clay liners or geomembranes

In February 2019, the Gold Fields Board strengthened its oversight of the Group's TSFs through the introduction of quarterly TSF management reports, progressive implementation of continuous environmental and geotechnical monitoring, and increased external and independent verification. The Chairperson of the Board Safety, Health and Sustainable Development Committee visited all managed TSFs during 2019 and reported his satisfaction with their management to the Committee.

A new corporate position of Group Head of Tailings was also created and filled with a qualified and experienced geotechnical engineer.

The following activities are planned for 2020, many of which commenced in 2019:

  • Implementation of a new TSF incident reporting standard
  • Completion of the three-yearly independent external TSF audits
  • Gap assessment of current TSF operating and governance practices against the new GTS
  • Further rollout of real-time TSF geotechnical and environmental monitoring, including, for example, the use of the InSAR satellite scanning technology where practical
  • Finalisation and approval of a new TSF Management Policy and new TSF technical guidelines
Waste management
Group mining waste

Total Group waste rock mined decreased 5% in 2019, due to completion of the Gruyere mine construction and lower volumes from the Damang Reinvestment project.

Gold Fields has set a target to maintain general landfill waste mass (non-hazardous waste other than tailings and waste rock) at 2015 levels of 11.2Mt, by ensuring a reduction in the waste that reaches landfill through greater use of on-site waste separation and recycling. During 2019, however, the Group's landfill waste rose to 12.8Mt from 9.0Mt in 2018 as gold production picked up. The disposal of hazardous waste declined from 1.5Mt in 2018 to 1.3Mt in 2019, while the amount of metal and material recycled and reused dropped to 13.8Mt (2018: 20.0Mt). Half of all hazardous and non-hazardous waste produced by our mines was recycled or reused, mostly by external service providers.

Methods of tailings construction

Upstream
Downstream
Source: Jon Engels www.tailings.info/disposal/conventional.htm

With a downstream TSF, a new embankment raise is constructed, mostly with fill materials, in the downstream slope of the previous raise. The crest of the embankment thereby moves "downstream" or away from the centre of the dam. In upstream TSFs, each new embankment raise is constructed partially on the embankment immediately below and partially on the consolidated tailings beach adjacent to the embankment. The crest of the embankment thereby moves "upstream". The centre-line method is a combination of the upstream and downstream designs. When raised, material is placed on both the tailings and the existing embankment so the embankment crest is raised vertically. In-pit tailings disposal makes use of worked out open pits.

Backfilled tailings are stored underground in previously worked out voids. They are generally mixed with a binder, usually cement, and then pumped underground. Backfilling, where economically and technically viable has several advantages, including avoiding surface deposition, extraction of in situ pillars containing ore, improved underground support and reduced ventilation requirements because voids are filled.


Mine closure

Sustainable and integrated mine closure continues to be one of Gold Fields' five key sustainability focus areas. We aim to reduce our environmental, community and social impacts, optimise our closure liabilities and, where possible, enhance asset values. All our mines have closure plans and closure cost estimates in place, which are reviewed and updated annually.

The Group's focus on progressive rehabilitation – the implementation of closure activities during the construction and operation of the mine – was further entrenched at our operations in 2019. Progressive rehabilitation presents many opportunities for mining operations, including strengthening relationships and credibility with regulators and stakeholders, reducing closure liabilities and achieving cost savings through:

  • Utilising available equipment
  • Eliminating the need for contractor mobilisation costs
  • Utilising current resources, such as the environmental management team
  • Potential tax savings
  • Improving the rehabilitation knowledge base

Progressive rehabilitation opportunities, as identified in our mine closure plans, were embedded into our mines' 2019 business plans. Gold Fields sets targets for operations to achieve at least 75% of the progressive rehabilitation plans in 2019. Of our seven managed mines, excluding Gruyere, all managed to implement at least 78% of their plans with only South Deep, at 70%, falling short of target. In 2020 we aim to further intensify our progressive rehabilitation activities at our operations with more aggressive targets.

All our operations updated their 2019 closure cost estimates, which were externally assured. The funding methods used in each region to make provision for the mine closure cost estimates are:

  • Peru – bank guarantees
  • Australia – existing cash and resources1
  • Ghana – reclamation security agreements and bonds underwritten by banks along with restricted cash
  • South Africa – contributions into environmental trust funds and guarantees

The total gross mine closure liability for Gold Fields increased by 9% to US$436m in 2019, in part due to the closure costs relating to our new renewable energy plants in Australia. A breakdown is provided in the table below:

  Group closure estimates 2019 (US$m) 2019 2018
  Australia region1,2 198 178
  West Africa region 106 100
  Americas region3 87 79
  South Africa region 46 42
  Group total 436 400
1 Due to legislative changes introduced in Western Australia, there is no longer a legal obligation to have unconditional performance bonds in place for mine closure liabilities. Such liabilities for continuing operations are now self-funding. In addition, companies are now required to pay a levy to the state based on the total mine closure liability. This levy is 1% of the total liability per mine, paid annually. This levy goes into a state administered fund known as the Mine Rehabilitation Fund. Capital and interest from the fund will be used to rehabilitate legacy sites or sites that have prematurely closed or been abandoned
2 Includes 50% of the total Gruyere closure cost estimate
3 Includes Salares Norte project conceptual closure cost estimate

 