Tarkwa gold mine - Mineral Resources and Mineral Reserves
The year-on-year Mineral Resources and Mineral Reserves have changed by -5% and -3% respectively, as a result of mining depletion, resource model and mine design changes, inclusions and cost input updates.
Stockpile tonnage and grade estimates are based on accumulations of estimated tonnage and grades trucked throughout the history of the mine, and are therefore considered to be reasonably accurate. However, the grades and tonnages are discounted by 5% for processing purposes, as experience has shown that this is realistically achievable when reclaiming a stockpile. Unless otherwise stated, all Mineral Resources and Mineral Reserves are quoted as 100% managed and are not attributable with respect to ownership.
Mineral Resources
The Mineral Resource and Mineral Reserve estimates have been updated using the current Gold Fields planning gold price of US$1,400/oz and US$1,200/oz respectively and reported in accordance with the SAMREC Code. The surface sources include stockpiles that are supported by adequate sampling, and are thus classified as Measured Mineral Resources, plus the South Heap Leach material, which is classified as Indicated.
Mineral Resources are quoted at an appropriate in situ economic cut-off grade, with tonnages and grades based on the resource block model. They also include estimates of any material below the cut-off grade that is required to be mined in order to extract the complete pay portion of the Mineral Resource.
Mineral Resource classification
Tonnes (kt) | Grade (g/t) | Gold (koz) | ||||||||||||
Classification | Dec 2017 | Dec 2016 | Dec 2015 | Dec 2017 | Dec 2016 | Dec 2015 | Dec 2017 | Dec 2016 | Dec 2015 | |||||
Open pit and underground | ||||||||||||||
Measured | 58,700 | 66,833 | 70,439 | 1.45 | 1.47 | 1.47 | 2,741 | 3,160 | 3,324 | |||||
Indicated | 108,342 | 110,820 | 117,029 | 1.33 | 1.33 | 1.33 | 4,634 | 4,746 | 5,015 | |||||
Inferred | 5,497 | 5,577 | 4,752 | 1.18 | 1.17 | 1.13 | 209 | 210 | 172 | |||||
Total in situ | 172,538 | 183,230 | 192,220 | 1.37 | 1.38 | 1.38 | 7,584 | 8,116 | 8,511 | |||||
Surface | ||||||||||||||
Measured stockpiles | 12,245 | 8,440 | 6,588 | 0.77 | 0.76 | 0.72 | 303 | 207 | 152 | |||||
South Heap Leach (Indicated) | 59,977 | 59,977 | 59,977 | 0.40 | 0.40 | 0.40 | 771 | 771 | 771 | |||||
Total surface | 72,222 | 68,416 | 66,565 | 0.46 | 0.44 | 0.43 | 1,074 | 978 | 924 | |||||
Grand total | 244,760 | 251,646 | 258,785 | 1.10 | 1.12 | 1.13 | 8,658 | 9,094 | 9,435 |
Mineral Resource classification per mining area
Measured | Indicated | Inferred | Total Mineral Resource | ||||||||||||
Open pit | Tonnes (kt) |
Grade (g/t) |
Gold (koz) |
Tonnes (kt) |
Grade (g/t) |
Gold (koz) |
Tonnes (kt) |
Grade (g/t) |
Gold (koz) |
Tonnes (kt) |
Grade (g/t) |
Gold (koz) |
|||
Akontansi | 20,465 | 1.29 | 847 | 82,409 | 1.28 | 3,394 | 4,411 | 1.10 | 157 | 107,285 | 1.28 | 4,398 | |||
Kottraverchy | 9,982 | 1.66 | 533 | 71 | 1.01 | 2 | — | 10,053 | 1.66 | 535 | |||||
Pepe/Mantraim | 10,042 | 1.43 | 462 | 5,887 | 1.18 | 223 | 561 | 1.44 | 26 | 16,490 | 1.34 | 711 | |||
Teberebie | 18,211 | 1.54 | 899 | 19,974 | 1.58 | 1,015 | 525 | 1.57 | 26 | 38,710 | 1.56 | 1,940 | |||
Total open pit | 58,700 | 1.45 | 2,741 | 108,342 | 1.33 | 4,634 | 5,497 | 1.18 | 209 | 172,538 | 1.37 | 7,584 | |||
Surface | |||||||||||||||
Spent Ore (South Heap Leach) | — | — | — | 59,977 | 0.40 | 771 | — | — | — | 59,977 | 0.40 | 771 | |||
Surface stockpiles | 12,245 | 0.77 | 303 | — | — | — | — | — | — | 12,245 | 0.77 | 303 | |||
Total surface | 12,245 | 0.77 | 303 | 59,977 | 0.40 | 771 | — | — | — | 72,222 | 0.46 | 1,074 | |||
Grand total | 70,945 | 1.33 | 3,044 | 168,319 | 1.00 | 5,405 | 5,497 | 1.18 | 209 | 244,760 | 1.10 | 8,658 |
Modifying factors
- The Measured and Indicated Mineral Resources are inclusive of those Mineral Resources modified to produce Mineral Reserves in the LoM plan
- All Mineral Reserves are quoted in terms of RoM grades and tonnages as delivered to the metallurgical processing facilities and are therefore fully diluted
- Unless otherwise stated, all Mineral Resources and Mineral Reserves are quoted as 100% managed and are not attributable with respect to ownership
- Mineral Resources and Mineral Reserves undergo regular internal and/or external audits, and any issues identified are rectified at the earliest opportunity
December | ||||||||
---|---|---|---|---|---|---|---|---|
Units | 2017 | 2016 | 2015 | |||||
Mineral Resource parameters | ||||||||
Mineral Resource gold price | US$/oz | 1,400 | 1,400 | 1,500 | ||||
Cut-off for mill feed | g/t | 0.37 | 0.4 | 0.38 | ||||
Mineral Reserve parameters | ||||||||
Mineral Reserve gold price | US$/oz | 1,200 | 1,200 | 1,300 | ||||
Cut-off for mill feed | g/t | 0.44 | 0.47 | 0.45 | ||||
Mining recovery factor (open pit) | % | 100 | 100 | 100 | ||||
Strip ratio (waste:ore) | ratio | 5.0 | 5.1 | 5.4 | ||||
MCF | % | 98 | 98 | 98 | ||||
Dilution open pit1 | cm | 30/20 | 30/20 | 30/20 | ||||
Plant recovery factor - CIL | % | 97.0 | 97.0 | 97.0 | ||||
CIL processing capacity | Mtpa | 13.7 | 13.5 | 13.5 |
1 Refers to 30cm hangingwall and 20cm footwall dilution respectively
Grade tonnage curve
Grade tonnage curve for the entire open pit Mineral Resource is presented below
Grade tonnage curve - Surface | |
![]() |
Mineral Reserves
The Mineral Reserve estimate for Tarkwa gold mine is based on the development of appropriately detailed and engineered LoM plans. All design and scheduling work is undertaken to an applicable level of detail by experienced engineers using mine-planning software. The planning process incorporates realistic modifying factors and the use of appropriate cut-off grades, geotechnical criteria, mining fleet productivities and other techno-economic investigations.
Mineral Reserve statements include only Measured and Indicated Mineral Resources modified to produce Mineral Reserves contained in the LoM plan. This declaration is based on the premise that all the ore will be treated through the CIL plant.
Mineral Reserve classification
Tonnes (kt) | Grade (g/t) | Gold (koz) | ||||||||||||
Classification | Dec 2017 | Dec 2016 | Dec 2015 | Dec 2017 | Dec 2016 | Dec 2015 | Dec 2017 | Dec 2016 | Dec 2015 | |||||
Open pit | ||||||||||||||
Proved | 40,464 | 53,542 | 63,266 | 1.26 | 1.28 | 1.30 | 1,644 | 2,200 | 2,635 | |||||
Probable | 82,015 | 74,150 | 81,506 | 1.21 | 1.22 | 1.22 | 3,188 | 2,903 | 3,187 | |||||
Total open pit | 122,479 | 127,692 | 144,773 | 1.23 | 1.24 | 1.25 | 4,832 | 5,104 | 5,822 | |||||
Surface | ||||||||||||||
Proved stockpiles | 12,245 | 8,440 | 6,588 | 0.77 | 0.76 | 0.72 | 303 | 207 | 152 | |||||
South Heap Leach (Probable) | 59,977 | 59,977 | 59,977 | 0.40 | 0.40 | 0.40 | 771 | 771 | 771 | |||||
Total surface | 72,222 | 68,416 | 66,565 | 0.46 | 0.44 | 0.43 | 1,074 | 978 | 924 | |||||
Grand total | 194,701 | 196,108 | 211,338 | 0.94 | 0.96 | 0.99 | 5,906 | 6,082 | 6,746 |
Mineral Reserve classification per mining area
Proved | Probable | Total Mineral Reserve | ||||||||||||
Mining area | Tonnes (kt) |
Grade (g/t) |
Gold (koz) |
Tonnes (kt) |
Grade (g/t) |
Gold (koz) |
Tonnes (kt) |
Grade (g/t) |
Gold (koz) |
|||||
Open pit | ||||||||||||||
Akontansi | 14,402 | 1.09 | 504 | 61,334 | 1.14 | 2,250 | 75,735 | 1.13 | 2,753 | |||||
Kottraverchy | 4,413 | 1.39 | 198 | — | — | — | 4,413 | 1.40 | 198 | |||||
Pepe/Mantraim | 6,467 | 1.30 | 271 | 1,162 | 1.05 | 39 | 7,629 | 1.26 | 310 | |||||
Teberbie | 15,183 | 1.38 | 672 | 19,519 | 1.43 | 899 | 34,702 | 1.41 | 1,570 | |||||
Total open pit | 40,464 | 1.26 | 1,644 | 82,015 | 1.21 | 3,188 | 122,479 | 1.23 | 4,832 | |||||
Surface | ||||||||||||||
Spent ore (SHL) | — | — | — | 59,977 | 0.40 | 771 | 59,977 | 0.40 | 771 | |||||
Surface stockpiles | 12,245 | 0.77 | 303 | — | — | — | 12,245 | 0.77 | 303 | |||||
Total surface stockpiles | 12,245 | 0.77 | 303 | 59,977 | 0.40 | 771 | 72,222 | 0.46 | 1,074 | |||||
Grand total | 52,709 | 1.15 | 1,947 | 141,991 | 0.87 | 3,959 | 194,701 | 0.94 | 5,906 |

Mineral Resource and Mineral Reserve reconciliation year-on-year
Factors that affected Mineral Resource year-on-year | Factors that affected Mineral Reserve year-on-year | |
---|---|---|
Depletion by mining | Depletion by mining | |
Updated economic factors | Improved costs | |
Mineral Resource model updates, predominately at Akontansi and PAMTA | Mineral Resource model updates | |
Re-optimisation/re-engineering of pit designs at Teberebie and Akontansi |
Mineral Resource reconciliation (Gold – koz) | Mineral Reserve reconciliation (Gold – koz) | |
![]() |
![]() |
Mineral Reserve sensitivity
The Mineral Reserve sensitivity has been derived from the application of the relevant cut-off grades to individual grade tonnage curves of the optimised pit shells for the open pits.
The Mineral Reserve sensitivities are not based on detailed depletion schedules and should be considered on a relative and indicative basis only. The following graphs indicate the Managed Mineral Reserve sensitivity at -15%, -10%, -5%, base (US$1,200/oz), +5%, +10%, and +15% to the gold price.
Mineral Reserve sensitivity (Gold – Moz) | |
![]() |