Salares Norte classified Mineral Resource

Deposit Class Tonnes
(Mt)
Gold
(g/t)
Silver
(g/t)
Gold
(Moz)
Silver
(Moz)
 
Brecha Principal Indicated 15.610 5.18 83.06 2.601 41.683  
  Inferred 0.911 2.12 14.59 0.062 0.428  
  Sub-total 16.521 5.01 79.28 2.663 42.111  
Agua Amarga Indicated 5.345 5.18 40.09 0.890 6.890  
  Inferred 1.432 2.40 9.93 0.110 0.457  
  Sub-total 6.777 4.59 33.71 1.000 7.347  
  Total 23.298 4.89 66.03 3.663 49.458  
Total Mineral Resource Tonnes (Mt)     Grade Au and Ag = g/t     Content Au and Ag = Moz  
Classification Dec
2017
  Dec
2016
Dec
2015
    Dec
2017
  Dec
2016
Dec
2015
    Dec
2017
  Dec
2016
Dec
2015
 
Indicated - gold 21.0   12.1 6.8     5.2   5.1 4.5     3.491   1.963 0.977  
Inferred - gold 2.3   13.5 20.0     2.3   4.2 3.7     0.172   1.831 2.370  
Total - gold 23.3   25.6 26.8     4.9   4.6 3.9     3.663   3.794 3.347  
Indicated - silver 21.0   12.1 6.8     72.1   69.6 82.7     48.573   27.075 18.133  
Inferred - silver 2.3   13.5 20.0     11.7   38.4 37.4     0.885   16.670 24.001  
Total - silver 23.3   25.6 26.8     66.0   53.1 48.9     49.458   43.755 42.134  

Notes:

Mineral Resources are reported in accordance with SAMREC
Confidence classification assumes annual production-scale and open pit mining
These Mineral Resources are classified as Indicated and Inferred. The Competent Person has reasonable confidence in the Resources, but future drilling may materially change the Resource evaluation.
Attributable metal to Gold Fields is 100%
Commodity prices used in this study are US$1,400/oz gold and US$20/oz silver
Mineral Resources are constrained within a Whittle optimised pit shell taking into consideration mining, processing, administration costs, process recovery and sustaining capital
Mineral Resources are reported for material within a pit shell having positive value after process recoveries and costs for processing, refining, royalty and overhead have been applied. A variable cut-off is applied since the process costs and recoveries are dependent on the head grade. This resulted in an average economic cut-off of US$45.88/tonne - processed based on 1% royalty, average process recovery of 92% for gold 70% silver and refining costs of US$2.78/oz for gold and US$1.21/oz for silver
Mineral Resources are reported without mining dilution and ore loss. Mining dilution and loss were accounted for in-pit shell generation
Figures are rounded to reflect confidence. Some grades may not average exactly due to rounding. The Competent Person deems these small discrepancies to be immaterial

Factors affecting Mineral reconciliation year-on-year

Brecha Principal was stable year-on-year
Agua Amarga reported reduced tonnes due to revised pit slope angles and modelling changes informed by additional drilling, geological interpretation and resource model estimation
Significant improvement in Resource model confidence (SAMREC) from 52% Indicated to 95% Indicated on metal supported by an additional ~35km of drilling

Mineral Resource reconciliation (Gold – koz)

Drill holes completed to date showing collar and trace
Plan view, Salares Norte Project – Mineral Resource areas